Seaar

CHANGE ORDER

Pleasure craft Β· United States of America

No IMO
MMSI 368276670
active

Current position

No live position received yet. Identity and particulars below.

Identity & particulars

Name
CHANGE ORDER
IMO number
β€”
MMSI
368276670
Call sign
β€”
Flag
πŸ‡ΊπŸ‡Έ United States of America
Vessel type
Pleasure craft
Gross tonnage
β€”
Deadweight (DWT)
β€”
Length overall
6 m
Beam
20 m
Year built
β€”
Builder
β€”
Registered owner
β€”
Operator
β€”

Particulars are enriched from public sources as they become available. Position & identity are derived live from AIS.

Frequently asked questions

Where is CHANGE ORDER now?
CHANGE ORDER has not transmitted a live position recently. Its identity and particulars are kept on this page, and its position will appear here the moment it is detected on AIS again.
What kind of ship is CHANGE ORDER?
CHANGE ORDER is a pleasure craft sailing under the flag of United States of America. The vessel is 6 m long with a beam of 20 m.
Has CHANGE ORDER been detained or sanctioned?
No detentions or sanctions for CHANGE ORDER appear in the public sources Seadar tracks (USCG PSIX inspections and the OFAC SDN list).

Similar pleasure crafts