Seaar

CHANGE ORDER

Not available · United Kingdom · Class B

No IMO
MMSI 232065011
active

Current position

updated 4 days ago
Position
43.2001° N, 6.6940° E
Area
Mediterranean Sea
Speed
25.3 kn
Course
27°
Heading
Status
Unknown
Destination

Identity & particulars

Name
CHANGE ORDER
IMO number
MMSI
232065011
Call sign
Flag
🇬🇧 United Kingdom
Vessel type
Not available
Gross tonnage
Deadweight (DWT)
Length overall
Beam
Year built
Builder
Registered owner
Operator

Particulars are enriched from public sources as they become available. Position & identity are derived live from AIS.

Frequently asked questions

Where is CHANGE ORDER now?
CHANGE ORDER (MMSI 232065011) was last detected in the Mediterranean Sea at 43.2001° N, 6.6940° E, making 25.3 knots — 4 days ago. Seadar tracks CHANGE ORDER live and free using AIS, with no paywall on position or identity.
What kind of ship is CHANGE ORDER?
CHANGE ORDER is a not available sailing under the flag of United Kingdom.
Has CHANGE ORDER been detained or sanctioned?
No detentions or sanctions for CHANGE ORDER appear in the public sources Seadar tracks (USCG PSIX inspections and the OFAC SDN list).

Similar not availables